General Construction
Part B Specification and Response Requirements
Annexure 2- Minimum Design & Construction Specification
Page 12 Updated 19/07/2013
Contractors should note these conditions apply also to any trees adjacent any SAHT land,
such as trees on Council property, street trees and trees on neighbour’s land.
1.2.7 Possession of Site
Prior to commencement on site of any work, SAHT will issue a “Possession of Site Notice”
(DPS) to the contractor. DPS will not be issued to the contractor until the contract has been
signed and executed.
Prior to the issue of DPS, the contractor must provide current Contractors All Risks and
Public Liability Insurances which must be maintained and current throughout the period of
the contract.
No work on site shall commence until a Possession of Site Notice has been issued, and the
site has been jointly inspected by both a representative of the contractor and someone
authorised by SAHT.
At the site inspection the SAHT representative will:
1. Ascertain with the contractor the position of any existing trees and whether any tree
on or adjacent the site is deemed a “significant tree”. Any trees identified for
retention, significant or otherwise will be adequately protected from damage during
the currency of the contract. Contractors are reminded that significant financial
penalties exist for breaches of the Development Act;
2. Ensure all Work Health and Safety (WHS) requirements are met;
3. Inspect all boundary fences to determine those which need replacement or
alteration;
4. Reinforce the issuing of fencing notices to applicable neighbours;
5. Reinforce the requirements when working on council or neighbouring properties.
6. Check for Sewer and Water connections (all coordinated and paid for by SAHT);
7. Check for any gas and electrical connections;
8. Check for any over head wires or other obstructions or near the site;
9. Locate all boundary marks including survey pegs and metal pins;
10. Identify Permanent Survey Markers and Temporary Bench Marks.
11. Issue the contractors representative with a copy of the identification survey, showing
all boundary marks and a copy of the sewer and water service locations;
12. Arrange with Senior Property Officer (SAHT) to remove any rubbish from site and
cut grass if necessary;
13. Reinforce the requirements relating to rainwater tanks connected to toilets and
stormwater detention;