MDF mouldings and linings shall be pre-primed. Do not use MDF where it may be exposed
to water.
All timber mouldings fitted to wet areas are to be protected from moisture, particularly to cut
ends at the tiled floor and backs/edges against plasterboard wall linings.
3.6.7 Impact and Scratch Resistant Linings
3.6.7.1 General
Wall protection will depend on the type of accidental damage that may occur and will depend
on the particular tenant’s requirements. The areas to be treated, and the type of treatment,
will be specified in Part B - Specification & Response Requirements ANNEXURE 1.
The height of the protection shall be as specified or if not specified 100 mm higher than the
height of the parts of the equipment that can damage the wall.
3.6.7.2 Scratch Resistance
This is required where the equipment the tenant uses are likely to scratch the surface but is
unlikely to knock holes into a plasterboard wall.
The protection is to be one of the following:-.
Vinyl, as per the door protection, ceramic tiles, or. 6 mm thick FRCB or 6 mm MDF or 6 mm
Mag board, painted to match the wall.
The sheet materials shall be laid horizontally and fixed over the plasterboard linings into the
studs as per the manufacturer’s recommendations for use as a wall lining. Seal the top edge
to the wall with a flexible sealant prior to painting and paint the sealant.
3.6.7.3 Impact Resistance Low Level
In general this will require a scratch resistant material as it is intended to withstand the
impact forces of the equipment e.g. foot plates of wheel chairs.
The protection is to be one of the following:- .
9 mm thick FRCB or 12 mm MDF or 9mm Mag board or 9 mm plywood painted either to
match the wall or to be a feature as a dado.
The sheet materials shall be laid horizontally. It can either be added to the face of the wall or
replace the bottom sheet of the wall lining. It shall be fixed in accordance with the
manufacturer’s recommendations for use as a wall lining.. and either fixed through the
plasterboard linings, or replace the linings for the lower part of the wall into the studs as per
the manufacturer’s recommendations for use as a wall lining. Either seal the top edge to the
wall prior to painting and paint the sealant or install a painted cover bead rebated to cover
the top of the protection board.
3.6.7.4 Impact Resistance Full Height
Full height protection would generally be required for a person who has a condition where
they have violent behaviour or fits caused by their disability.
The lining is to be one of the following:-
9 mm thick FRCB or 9mm Mag board or 9 mm plywood painted as a wall.